SERVEL MERA – AN ENERGY RICH HISTORY

SERVEL MERA was founded in 1999 in the diversification plan of the Cescutti Group's activities.
The authorization for the construction of a first hydroelectric plant, located in the Municipality of Gordona (SO - Italy) is thus acquired.

These are the other stages of the company's growth:

  • 2001
    - Construction of the hydroelectric plant in the Municipality of Gordona (SO - Italy)
  • 2004
    - Acquisition of two hydroelectric power plants in the Municipality of Ovaro (UD - Italy)
  • 2006
    - Revamping of Ovaro hydroelectric plants in a single production plant
  • 2009
    - Start of authorization procedures for the construction of PV plants in Italy for a total of 12 MWp
  • 2011
    Construction of photovoltaic systems in Italy for a total of 12 MWp
  • 2012
    - Start of authorization procedures for the construction of biomass plants with the use of by-products of wood processing
  • 2013
    - Start of construction of the biomass power plant in the Municipality of Sutrio (UD - ITALY)
  • 2014/2015
    - Construction of the biomass power plant in the Municipality of Sutrio and commissioning
  • 2016/2017
    - Construction of hydroelectric plants on the Poma and Rosamarina aqueducts in the province of Palermo
    - Construction of the first lot of the district heating network in the municipality of Sutrio (UD - ITALY)
  • 2018/2019
    - Construction of the second lot of the district heating network in the municipality of Sutrio (UD - ITALY)
    - Start of Internationalization of the Company